Thurso
36 delay minutes
The biggest share (42%) of the delay picked up at Thurso in the four weeks to 9 December 2023 came from outside causes like vandalism, cable theft, animals and fires.
0% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | Trains cancelled |
|---|---|---|---|---|
| Network Rail's causes | ||||
| Track | - | - | 8% | - |
| Signals, points and power | - | - | 16% | - |
| Weather and structures | 7 | 19% | 7% | - |
| Autumn | - | - | 7% | - |
| External | 15 | 42% | 4% | - |
| Network management | 4 | 11% | 17% | - |
| The operators' causes | ||||
| Train faults | - | - | 16% | - |
| Traincrew | - | - | 11% | - |
| Stations | 10 | 28% | 3% | - |
| Operations | - | - | 5% | - |
| Operator, other | - | - | 7% | - |
Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| XK | National Grid Power Failure - local area also affected (inc outage, surges, blips where working standby generator/UPS installed) | 15 |
| RB | Passengers joining/alighting | 10 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 7 |
| JP | Failure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards | 4 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| MD | Technical failures below the solebar | 139 |
| I0 | Telecom equipment legacy radio failures (RETB) | 129 |
| QA | WTT schedule and or LTP Process including erroneous simplifiers | 92 |
| X9 | Points failure caused by severe snow or ice where heaters are fitted and working as designed | 82 |
| FO | Time Lost en-route believed to be operator cause and information required from Operator (Ops Responsibility) | 70 |
| M8 | Technical failures above the Solebar | 59 |
| ZU | No Cause Identified After investigation by both Parties | 47 |
| RB | Passengers joining/alighting | 46 |
| M0 | Confirmed train cab based safety system fault (including GSMR) | 36 |
| QI | Cautioning due to railhead leaf contamination | 32 |