36 delay minutes

The biggest share (42%) of the delay picked up at Thurso in the four weeks to 9 December 2023 came from outside causes like vandalism, cable theft, animals and fires.

0% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideTrains cancelled
Network Rail's causes
Track--8%-
Signals, points and power--16%-
Weather and structures719%7%-
Autumn--7%-
External1542%4%-
Network management411%17%-
The operators' causes
Train faults--16%-
Traincrew--11%-
Stations1028%3%-
Operations--5%-
Operator, other--7%-

Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.

Period by period

Delay minutes a day, period by period. Gridlines every 1 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
XKNational Grid Power Failure - local area also affected (inc outage, surges, blips where working standby generator/UPS installed)15
RBPassengers joining/alighting10
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail7
JPFailure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards4
Since 2018
CodeWhat Network Rail loggedMinutes
MDTechnical failures below the solebar139
I0Telecom equipment legacy radio failures (RETB)129
QAWTT schedule and or LTP Process including erroneous simplifiers92
X9Points failure caused by severe snow or ice where heaters are fitted and working as designed82
FOTime Lost en-route believed to be operator cause and information required from Operator (Ops Responsibility)70
M8Technical failures above the Solebar59
ZUNo Cause Identified After investigation by both Parties47
RBPassengers joining/alighting46
M0Confirmed train cab based safety system fault (including GSMR)36
QICautioning due to railhead leaf contamination32