Tulse Hill
825 delay minutes
The biggest share (45%) of the delay picked up at Tulse Hill in the four weeks to 9 December 2023 came from track faults.
27% of these minutes were knock-on from something that happened elsewhere first. 60% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 371 | 45% | 8% | 13 a day, the most in 5 years | - |
| Signals, points and power | 245 | 30% | 16% | 9 a day, more than 3 of the other 4 years | 1 |
| Weather and structures | 3 | <1% | 7% | 0 a day, more than 1 of the other 4 years | - |
| Autumn | 8 | <1% | 7% | 0 a day, more than 3 of the other 4 years | - |
| External | - | - | 4% | 0 a day, the least in 5 years | - |
| Network management | 142 | 17% | 17% | 5 a day, more than 2 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 18 | 2% | 16% | 1 a day, more than 1 of the other 4 years | - |
| Traincrew | 18 | 2% | 11% | 1 a day, the least in 5 years | - |
| Stations | - | - | 3% | 0 a day, the least in 5 years | - |
| Operations | - | - | 5% | 0 a day, the least in 5 years | - |
| Operator, other | 21 | 2% | 7% | 1 a day, the least in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 371 |
| I1 | Overhead line/third rail defect | 91 |
| J3 | Axle Counter Failure | 83 |
| OK | Delay caused by Operating staff oversight, issues or absence (excluding signallers and Control) | 57 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 38 |
| IA | Signal failure (including no fault found) | 32 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 23 |
| TG | Driver | 14 |
| I5 | Possession over-run from planned work | 12 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 11 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 3,642 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 2,961 |
| TG | Driver | 2,533 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 1,320 |
| IC | Track circuit failure (including no fault found) | 1,266 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 1,173 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 1,149 |
| OB | Delayed by signaller not applying applicable regulating policy | 1,144 |
| IB | Points failure (including no fault found) | 1,082 |
| XP | BRIDGE HIT | 1,044 |