Tywyn
456 delay minutes
The biggest share (33%) of the delay picked up at Tywyn in the four weeks to 9 December 2023 came from faulty trains.
92% of these minutes were knock-on from something that happened elsewhere first. 76% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | - | - | 8% | 0 a day, the least in 5 years | - |
| Signals, points and power | 13 | 3% | 16% | 0 a day, more than 3 of the other 4 years | - |
| Weather and structures | - | - | 7% | 0 a day, the least in 5 years | 3 |
| Autumn | 123 | 27% | 7% | 4 a day, the most in 5 years | - |
| External | 3 | <1% | 4% | 0 a day, more than 3 of the other 4 years | 1 |
| Network management | 90 | 20% | 17% | 3 a day, more than 3 of the other 4 years | 1 |
| The operators' causes | |||||
| Train faults | 149 | 33% | 16% | 5 a day, the most in 5 years | 10 |
| Traincrew | 72 | 16% | 11% | 3 a day, the most in 5 years | - |
| Stations | 3 | <1% | 3% | 0 a day, more than 2 of the other 4 years | - |
| Operations | - | - | 5% | 0 a day, the least in 5 years | 2 |
| Operator, other | 3 | <1% | 7% | 0 a day, more than 3 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| QH | Adhesion problems due to leaf contamination | 76 |
| TG | Driver | 51 |
| M7 | Door and Door system faults | 44 |
| QI | Cautioning due to railhead leaf contamination | 44 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 31 |
| JX | Miscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains) | 24 |
| MT | Confirmed train borne safety system faults (not cab based) | 24 |
| TH | (Senior) Conductor/Train Manager | 21 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 18 |
| ME | Steam locomotive failure/defect/attention | 17 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| T2 | Delay at unstaffed station to non-DOO train | 1,880 |
| M0 | Confirmed train cab based safety system fault (including GSMR) | 1,788 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 1,194 |
| M8 | Technical failures above the Solebar | 1,050 |
| MD | Technical failures below the solebar | 1,017 |
| TZ | Other Passenger Train Operating Company causes | 937 |
| OT | Ops Safety TSR implemented for sighting issues relating to foot crossings, level crossings or signals (Not vegetation caused) | 838 |
| X2 | Severe flooding beyond that which could be mitigated on Network Rail infrastructure | 732 |
| J0 | Telecom equipment radio failure (GSM-R) | 701 |
| TG | Driver | 687 |