Leaves on the Line

Uckfield

UCK Sussex route
CSV JSON

311 delay minutes

The biggest share (35%) of the delay picked up at Uckfield in the four weeks to 9 December 2023 came from faulty trains.

86% of these minutes were knock-on from something that happened elsewhere first. 96% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track--8% 0 a day, the least in 5 years-
Signals, points and power3812%16% 1 a day, more than 2 of the other 4 years1
Weather and structures83%7% 0 a day, the least in 5 years-
Autumn93%7% 0 a day, more than 3 of the other 4 years-
External83%4% 0 a day, more than 2 of the other 4 years-
Network management6722%17% 2 a day, more than 2 of the other 4 years11
The operators' causes
Train faults10935%16% 4 a day, the most in 5 years1
Traincrew4314%11% 2 a day, more than 3 of the other 4 years-
Stations134%3% 0 a day, the most in 5 years-
Operations--5% 0 a day, the least in 5 years1
Operator, other165%7% 1 a day, more than 1 of the other 4 years1

Period by period

Delay minutes a day, period by period. Gridlines every 5 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
MYCoupler, Coupler system and Jumper cable faults45
MNBrake and brake systems faults; including wheel flats where no other cause had been identified35
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)33
OSLate start or delays to Railhead Conditioning or Ghost Train due to its own activity and not in reaction to another incident31
TH(Senior) Conductor/Train Manager27
MDTechnical failures below the solebar16
MUDepot operating problem13
TGDriver12
IDLevel crossing faults and failure incl. barrow/foot crossings and crossing treadles11
IISignalling lineside cable fault11
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver1,284
ICTrack circuit failure (including no fault found)1,051
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure1,035
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)938
IVCutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure)659
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.640
M8Technical failures above the Solebar590
IBPoints failure (including no fault found)529
MDTechnical failures below the solebar525
IRBroken/cracked/twisted/buckled/flawed rail467