Uckfield
311 delay minutes
The biggest share (35%) of the delay picked up at Uckfield in the four weeks to 9 December 2023 came from faulty trains.
86% of these minutes were knock-on from something that happened elsewhere first. 96% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | - | - | 8% | 0 a day, the least in 5 years | - |
| Signals, points and power | 38 | 12% | 16% | 1 a day, more than 2 of the other 4 years | 1 |
| Weather and structures | 8 | 3% | 7% | 0 a day, the least in 5 years | - |
| Autumn | 9 | 3% | 7% | 0 a day, more than 3 of the other 4 years | - |
| External | 8 | 3% | 4% | 0 a day, more than 2 of the other 4 years | - |
| Network management | 67 | 22% | 17% | 2 a day, more than 2 of the other 4 years | 11 |
| The operators' causes | |||||
| Train faults | 109 | 35% | 16% | 4 a day, the most in 5 years | 1 |
| Traincrew | 43 | 14% | 11% | 2 a day, more than 3 of the other 4 years | - |
| Stations | 13 | 4% | 3% | 0 a day, the most in 5 years | - |
| Operations | - | - | 5% | 0 a day, the least in 5 years | 1 |
| Operator, other | 16 | 5% | 7% | 1 a day, more than 1 of the other 4 years | 1 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| MY | Coupler, Coupler system and Jumper cable faults | 45 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 35 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 33 |
| OS | Late start or delays to Railhead Conditioning or Ghost Train due to its own activity and not in reaction to another incident | 31 |
| TH | (Senior) Conductor/Train Manager | 27 |
| MD | Technical failures below the solebar | 16 |
| MU | Depot operating problem | 13 |
| TG | Driver | 12 |
| ID | Level crossing faults and failure incl. barrow/foot crossings and crossing treadles | 11 |
| II | Signalling lineside cable fault | 11 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 1,284 |
| IC | Track circuit failure (including no fault found) | 1,051 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 1,035 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 938 |
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 659 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 640 |
| M8 | Technical failures above the Solebar | 590 |
| IB | Points failure (including no fault found) | 529 |
| MD | Technical failures below the solebar | 525 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 467 |