Leaves on the Line

Watton-at-Stone

WAS East Coast route
CSV JSON

0 delay minutes

No delay was picked up at Watton-at-Stone in the four weeks to 9 December 2023.

100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideTrains cancelled
Network Rail's causes
Track--8%-
Signals, points and power--16%-
Weather and structures--7%-
Autumn--7%-
External--4%-
Network management--17%-
The operators' causes
Train faults--16%-
Traincrew--11%-
Stations--3%-
Operations--5%-
Operator, other--7%-

Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.

Period by period

Delay minutes a day, period by period. Gridlines every 5 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
Nothing logged.
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver854
TITraincrew rostering problem271
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.222
M8Technical failures above the Solebar209
MDTechnical failures below the solebar207
IASignal failure (including no fault found)132
M1Confirmed Pantograph ADD, associated system faults, positive PANCHEX activations and train borne power switch over systems (AC)105
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure104
XPBRIDGE HIT90
JPFailure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards87