West Croydon
1,962 delay minutes
The biggest share (39%) of the delay picked up at West Croydon in the four weeks to 9 December 2023 came from how the network was run.
90% of these minutes were knock-on from something that happened elsewhere first. 98% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 27 | 1% | 8% | 1 a day, more than 1 of the other 4 years | - |
| Signals, points and power | 401 | 20% | 16% | 14 a day, the most in 5 years | 2 |
| Weather and structures | 16 | <1% | 7% | 1 a day, the most in 5 years | - |
| Autumn | 4 | <1% | 7% | 0 a day, the least in 5 years | - |
| External | 5 | <1% | 4% | 0 a day, the least in 5 years | 4 |
| Network management | 767 | 39% | 17% | 27 a day, more than 2 of the other 4 years | 7 |
| The operators' causes | |||||
| Train faults | 139 | 7% | 16% | 5 a day, more than 2 of the other 4 years | 7 |
| Traincrew | 155 | 8% | 11% | 6 a day, the least in 5 years | 2 |
| Stations | 291 | 15% | 3% | 10 a day, more than 3 of the other 4 years | - |
| Operations | 87 | 4% | 5% | 3 a day, more than 3 of the other 4 years | 1 |
| Operator, other | 70 | 4% | 7% | 3 a day, more than 1 of the other 4 years | 2 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 238 |
| RB | Passengers joining/alighting | 232 |
| II | Signalling lineside cable fault | 208 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 160 |
| TG | Driver | 150 |
| OB | Delayed by signaller not applying applicable regulating policy | 94 |
| I1 | Overhead line/third rail defect | 90 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 85 |
| OD | Delays due to National/Regional/Route Operations directives or Route Control decision or directive | 62 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 61 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 16,641 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 12,529 |
| OB | Delayed by signaller not applying applicable regulating policy | 10,082 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 7,525 |
| RB | Passengers joining/alighting | 5,213 |
| IC | Track circuit failure (including no fault found) | 3,700 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 3,690 |
| M8 | Technical failures above the Solebar | 2,705 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 2,587 |
| M7 | Door and Door system faults | 2,271 |