1,962 delay minutes

The biggest share (39%) of the delay picked up at West Croydon in the four weeks to 9 December 2023 came from how the network was run.

90% of these minutes were knock-on from something that happened elsewhere first. 98% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track271%8% 1 a day, more than 1 of the other 4 years-
Signals, points and power40120%16% 14 a day, the most in 5 years2
Weather and structures16<1%7% 1 a day, the most in 5 years-
Autumn4<1%7% 0 a day, the least in 5 years-
External5<1%4% 0 a day, the least in 5 years4
Network management76739%17% 27 a day, more than 2 of the other 4 years7
The operators' causes
Train faults1397%16% 5 a day, more than 2 of the other 4 years7
Traincrew1558%11% 6 a day, the least in 5 years2
Stations29115%3% 10 a day, more than 3 of the other 4 years-
Operations874%5% 3 a day, more than 3 of the other 4 years1
Operator, other704%7% 3 a day, more than 1 of the other 4 years2

Period by period

Delay minutes a day, period by period. Gridlines every 50 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)238
RBPassengers joining/alighting232
IISignalling lineside cable fault208
OCSignaller including mis-routing (not ERTM /ETCS related)160
TGDriver150
OBDelayed by signaller not applying applicable regulating policy94
I1Overhead line/third rail defect90
TOTime lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility)85
ODDelays due to National/Regional/Route Operations directives or Route Control decision or directive62
VHPassenger Communication cord, door egress or emergency train alarm operated61
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver16,641
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)12,529
OBDelayed by signaller not applying applicable regulating policy10,082
OCSignaller including mis-routing (not ERTM /ETCS related)7,525
RBPassengers joining/alighting5,213
ICTrack circuit failure (including no fault found)3,700
VHPassenger Communication cord, door egress or emergency train alarm operated3,690
M8Technical failures above the Solebar2,705
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure2,587
M7Door and Door system faults2,271