Wem
1,201 delay minutes
Most of the delay picked up at Wem in the four weeks to 9 December 2023 came from signal, points and power faults.
37% of these minutes were knock-on from something that happened elsewhere first. 98% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 3 | <1% | 8% | 0 a day, the least in 5 years | - |
| Signals, points and power | 619 | 52% | 16% | 22 a day, the most in 5 years | - |
| Weather and structures | - | - | 7% | 0 a day, the least in 5 years | - |
| Autumn | 99 | 8% | 7% | 4 a day, the most in 5 years | - |
| External | 24 | 2% | 4% | 1 a day, more than 3 of the other 4 years | - |
| Network management | 85 | 7% | 17% | 3 a day, the least in 5 years | - |
| The operators' causes | |||||
| Train faults | 208 | 17% | 16% | 7 a day, the most in 5 years | - |
| Traincrew | 77 | 6% | 11% | 3 a day, more than 2 of the other 4 years | - |
| Stations | 48 | 4% | 3% | 2 a day, more than 3 of the other 4 years | - |
| Operations | 33 | 3% | 5% | 1 a day, more than 2 of the other 4 years | - |
| Operator, other | 5 | <1% | 7% | 0 a day, more than 1 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 498 |
| QI | Cautioning due to railhead leaf contamination | 99 |
| JT | Points failure caused by snow or frost where heaters are not fitted | 75 |
| TG | Driver | 59 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 57 |
| M9 | Reported fleet equipment defect - no fault found | 49 |
| T2 | Delay at unstaffed station to non-DOO train | 48 |
| M8 | Technical failures above the Solebar | 47 |
| TZ | Other Passenger Train Operating Company causes | 28 |
| JP | Failure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards | 19 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 4,931 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 3,138 |
| OU | Delays not Investigated by Network Rail | 2,102 |
| TG | Driver | 2,051 |
| TZ | Other Passenger Train Operating Company causes | 1,652 |
| MD | Technical failures below the solebar | 1,587 |
| IA | Signal failure (including no fault found) | 1,473 |
| T2 | Delay at unstaffed station to non-DOO train | 1,447 |
| ID | Level crossing faults and failure incl. barrow/foot crossings and crossing treadles | 1,196 |
| M8 | Technical failures above the Solebar | 1,034 |