Westerton
590 delay minutes
The biggest share (19%) of the delay picked up at Westerton in the four weeks to 9 December 2023 came from other operator causes.
72% of these minutes were knock-on from something that happened elsewhere first. 98% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 57 | 10% | 8% | 2 a day, more than 3 of the other 4 years | - |
| Signals, points and power | 29 | 5% | 16% | 1 a day, more than 1 of the other 4 years | 3 |
| Weather and structures | 45 | 8% | 7% | 2 a day, the most in 5 years | - |
| Autumn | 72 | 12% | 7% | 3 a day, the least in 5 years | - |
| External | 24 | 4% | 4% | 1 a day, more than 3 of the other 4 years | - |
| Network management | 96 | 16% | 17% | 3 a day, more than 2 of the other 4 years | 1 |
| The operators' causes | |||||
| Train faults | 76 | 13% | 16% | 3 a day, more than 1 of the other 4 years | 1 |
| Traincrew | 46 | 8% | 11% | 2 a day, more than 2 of the other 4 years | - |
| Stations | 8 | 1% | 3% | 0 a day, more than 1 of the other 4 years | - |
| Operations | 25 | 4% | 5% | 1 a day, more than 2 of the other 4 years | - |
| Operator, other | 113 | 19% | 7% | 4 a day, more than 2 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| JP | Failure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards | 53 |
| Q3 | NZ Pumps T | 53 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 48 |
| TG | Driver | 38 |
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 37 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 35 |
| VW | Severe weather affecting passenger Fleet equipment including follwogin company standards/policies or Rule book instructions | 26 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 25 |
| JB | Reactionary Delay to 'P' coded TSRs | 22 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 19 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 3,621 |
| TG | Driver | 2,894 |
| M8 | Technical failures above the Solebar | 1,846 |
| OH | ARS / TMS / SARS software problem (excluding scheduling issues and technical failures) | 1,539 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 1,352 |
| Q3 | NZ Pumps T | 1,332 |
| X2 | Severe flooding beyond that which could be mitigated on Network Rail infrastructure | 1,133 |
| MD | Technical failures below the solebar | 1,080 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 1,013 |
| M7 | Door and Door system faults | 1,012 |