520 delay minutes

The biggest share (21%) of the delay picked up at Whifflet in the four weeks to 9 December 2023 came from how the network was run.

58% of these minutes were knock-on from something that happened elsewhere first. 95% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track92%8% 0 a day, the least in 5 years-
Signals, points and power163%16% 1 a day, the least in 5 years-
Weather and structures336%7% 1 a day, more than 2 of the other 4 years5
Autumn8416%7% 3 a day, more than 2 of the other 4 years-
External3<1%4% 0 a day, the least in 5 years-
Network management10921%17% 4 a day, more than 3 of the other 4 years1
The operators' causes
Train faults10620%16% 4 a day, the most in 5 years1
Traincrew5010%11% 2 a day, more than 2 of the other 4 years-
Stations3<1%3% 0 a day, more than 1 of the other 4 years-
Operations183%5% 1 a day, more than 2 of the other 4 years-
Operator, other9017%7% 3 a day, the most in 5 years2

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
Q3NZ Pumps T61
J8OTM DAMAGE44
M8Technical failures above the Solebar41
TTLeaf fall Neutral37
JXMiscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains)36
TGDriver31
MPRail / wheel interface, adhesion problems (including ice on the running rail)28
X9Points failure caused by severe snow or ice where heaters are fitted and working as designed24
OEFailure to lay Sandite or operate Railhead Conditioning train as programmed18
M1Confirmed Pantograph ADD, associated system faults, positive PANCHEX activations and train borne power switch over systems (AC)17
Since 2018
CodeWhat Network Rail loggedMinutes
TOTime lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility)2,360
TGDriver2,263
IBPoints failure (including no fault found)1,376
Q3NZ Pumps T1,011
OHARS / TMS / SARS software problem (excluding scheduling issues and technical failures)923
OCSignaller including mis-routing (not ERTM /ETCS related)889
MPRail / wheel interface, adhesion problems (including ice on the running rail)861
M8Technical failures above the Solebar835
MNBrake and brake systems faults; including wheel flats where no other cause had been identified710
XTSevere snow or ice affecting infrastructure which is the responsibility of NR (including implementation of Key Route Strategy)694