Whifflet
520 delay minutes
The biggest share (21%) of the delay picked up at Whifflet in the four weeks to 9 December 2023 came from how the network was run.
58% of these minutes were knock-on from something that happened elsewhere first. 95% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 9 | 2% | 8% | 0 a day, the least in 5 years | - |
| Signals, points and power | 16 | 3% | 16% | 1 a day, the least in 5 years | - |
| Weather and structures | 33 | 6% | 7% | 1 a day, more than 2 of the other 4 years | 5 |
| Autumn | 84 | 16% | 7% | 3 a day, more than 2 of the other 4 years | - |
| External | 3 | <1% | 4% | 0 a day, the least in 5 years | - |
| Network management | 109 | 21% | 17% | 4 a day, more than 3 of the other 4 years | 1 |
| The operators' causes | |||||
| Train faults | 106 | 20% | 16% | 4 a day, the most in 5 years | 1 |
| Traincrew | 50 | 10% | 11% | 2 a day, more than 2 of the other 4 years | - |
| Stations | 3 | <1% | 3% | 0 a day, more than 1 of the other 4 years | - |
| Operations | 18 | 3% | 5% | 1 a day, more than 2 of the other 4 years | - |
| Operator, other | 90 | 17% | 7% | 3 a day, the most in 5 years | 2 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| Q3 | NZ Pumps T | 61 |
| J8 | OTM DAMAGE | 44 |
| M8 | Technical failures above the Solebar | 41 |
| TT | Leaf fall Neutral | 37 |
| JX | Miscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains) | 36 |
| TG | Driver | 31 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 28 |
| X9 | Points failure caused by severe snow or ice where heaters are fitted and working as designed | 24 |
| OE | Failure to lay Sandite or operate Railhead Conditioning train as programmed | 18 |
| M1 | Confirmed Pantograph ADD, associated system faults, positive PANCHEX activations and train borne power switch over systems (AC) | 17 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 2,360 |
| TG | Driver | 2,263 |
| IB | Points failure (including no fault found) | 1,376 |
| Q3 | NZ Pumps T | 1,011 |
| OH | ARS / TMS / SARS software problem (excluding scheduling issues and technical failures) | 923 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 889 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 861 |
| M8 | Technical failures above the Solebar | 835 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 710 |
| XT | Severe snow or ice affecting infrastructure which is the responsibility of NR (including implementation of Key Route Strategy) | 694 |