Leaves on the Line

Welwyn Garden City

WGC East Coast route
CSV JSON

2,285 delay minutes

The biggest share (27%) of the delay picked up at Welwyn Garden City in the four weeks to 9 December 2023 came from how the network was run.

75% of these minutes were knock-on from something that happened elsewhere first. 97% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track894%8% 3 a day, the least in 5 years-
Signals, points and power1456%16% 5 a day, more than 1 of the other 4 years-
Weather and structures663%7% 2 a day, more than 2 of the other 4 years-
Autumn1235%7% 4 a day, more than 2 of the other 4 years1
External1306%4% 5 a day, more than 2 of the other 4 years-
Network management62727%17% 22 a day, more than 2 of the other 4 years42
The operators' causes
Train faults23010%16% 8 a day, more than 1 of the other 4 years10
Traincrew53023%11% 19 a day, more than 3 of the other 4 years16
Stations572%3% 2 a day, more than 3 of the other 4 years-
Operations693%5% 2 a day, more than 3 of the other 4 years1
Operator, other22010%7% 8 a day, more than 2 of the other 4 years2

Period by period

Delay minutes a day, period by period. Gridlines every 100 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
TGDriver432
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)152
OUDelays not Investigated by Network Rail147
XPBRIDGE HIT107
MUDepot operating problem102
Q3NZ Pumps T91
TTLeaf fall Neutral81
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.71
OKDelay caused by Operating staff oversight, issues or absence (excluding signallers and Control)66
OCSignaller including mis-routing (not ERTM /ETCS related)64
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver26,508
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.10,265
TITraincrew rostering problem9,149
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)7,640
M8Technical failures above the Solebar7,635
I1Overhead line/third rail defect5,303
IBPoints failure (including no fault found)5,132
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure4,549
ICTrack circuit failure (including no fault found)4,072
OCSignaller including mis-routing (not ERTM /ETCS related)3,981