Welwyn Garden City
2,285 delay minutes
The biggest share (27%) of the delay picked up at Welwyn Garden City in the four weeks to 9 December 2023 came from how the network was run.
75% of these minutes were knock-on from something that happened elsewhere first. 97% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 89 | 4% | 8% | 3 a day, the least in 5 years | - |
| Signals, points and power | 145 | 6% | 16% | 5 a day, more than 1 of the other 4 years | - |
| Weather and structures | 66 | 3% | 7% | 2 a day, more than 2 of the other 4 years | - |
| Autumn | 123 | 5% | 7% | 4 a day, more than 2 of the other 4 years | 1 |
| External | 130 | 6% | 4% | 5 a day, more than 2 of the other 4 years | - |
| Network management | 627 | 27% | 17% | 22 a day, more than 2 of the other 4 years | 42 |
| The operators' causes | |||||
| Train faults | 230 | 10% | 16% | 8 a day, more than 1 of the other 4 years | 10 |
| Traincrew | 530 | 23% | 11% | 19 a day, more than 3 of the other 4 years | 16 |
| Stations | 57 | 2% | 3% | 2 a day, more than 3 of the other 4 years | - |
| Operations | 69 | 3% | 5% | 2 a day, more than 3 of the other 4 years | 1 |
| Operator, other | 220 | 10% | 7% | 8 a day, more than 2 of the other 4 years | 2 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 432 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 152 |
| OU | Delays not Investigated by Network Rail | 147 |
| XP | BRIDGE HIT | 107 |
| MU | Depot operating problem | 102 |
| Q3 | NZ Pumps T | 91 |
| TT | Leaf fall Neutral | 81 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 71 |
| OK | Delay caused by Operating staff oversight, issues or absence (excluding signallers and Control) | 66 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 64 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 26,508 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 10,265 |
| TI | Traincrew rostering problem | 9,149 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 7,640 |
| M8 | Technical failures above the Solebar | 7,635 |
| I1 | Overhead line/third rail defect | 5,303 |
| IB | Points failure (including no fault found) | 5,132 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 4,549 |
| IC | Track circuit failure (including no fault found) | 4,072 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 3,981 |