737 delay minutes

The biggest share (23%) of the delay picked up at Welshpool in the four weeks to 9 December 2023 came from signal, points and power faults.

92% of these minutes were knock-on from something that happened elsewhere first. 83% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track--8% 0 a day, the least in 5 years-
Signals, points and power16623%16% 6 a day, more than 3 of the other 4 years-
Weather and structures264%7% 1 a day, more than 2 of the other 4 years-
Autumn11215%7% 4 a day, the most in 5 years-
External152%4% 1 a day, more than 2 of the other 4 years-
Network management7911%17% 3 a day, more than 3 of the other 4 years-
The operators' causes
Train faults15221%16% 5 a day, more than 2 of the other 4 years-
Traincrew10715%11% 4 a day, more than 3 of the other 4 years-
Stations81%3% 0 a day, more than 1 of the other 4 years-
Operations405%5% 1 a day, more than 3 of the other 4 years5
Operator, other324%7% 1 a day, more than 1 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
TGDriver70
QHAdhesion problems due to leaf contamination58
QICautioning due to railhead leaf contamination54
MSPlanned underpowered or shortformed service and or vehicle, incl. exam set swaps51
ICTrack circuit failure (including no fault found)37
TZOther Passenger Train Operating Company causes36
J0Telecom equipment radio failure (GSM-R)34
TH(Senior) Conductor/Train Manager34
M8Technical failures above the Solebar31
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions26
Since 2018
CodeWhat Network Rail loggedMinutes
MDTechnical failures below the solebar1,629
X2Severe flooding beyond that which could be mitigated on Network Rail infrastructure1,556
M0Confirmed train cab based safety system fault (including GSMR)1,353
JDStructures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes)1,312
MSPlanned underpowered or shortformed service and or vehicle, incl. exam set swaps1,292
TGDriver1,191
J0Telecom equipment radio failure (GSM-R)1,185
M8Technical failures above the Solebar1,087
TZOther Passenger Train Operating Company causes1,025
OUDelays not Investigated by Network Rail1,013