184 delay minutes

The biggest share (25%) of the delay picked up at Wemyss Bay in the four weeks to 9 December 2023 came from signal, points and power faults.

32% of these minutes were knock-on from something that happened elsewhere first. 98% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track--8% 0 a day, the least in 5 years-
Signals, points and power4625%16% 2 a day, more than 1 of the other 4 years-
Weather and structures3921%7% 1 a day, the most in 5 years1
Autumn2413%7% 1 a day, more than 3 of the other 4 years-
External--4% 0 a day, the least in 5 years-
Network management179%17% 1 a day, more than 2 of the other 4 years1
The operators' causes
Train faults179%16% 1 a day, more than 2 of the other 4 years1
Traincrew84%11% 0 a day, the most in 5 years1
Stations32%3% 0 a day, more than 2 of the other 4 years-
Operations105%5% 0 a day, more than 3 of the other 4 years1
Operator, other2111%7% 1 a day, more than 1 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
IASignal failure (including no fault found)43
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions25
MPRail / wheel interface, adhesion problems (including ice on the running rail)21
Q3NZ Pumps T21
M0Confirmed train cab based safety system fault (including GSMR)14
X9Points failure caused by severe snow or ice where heaters are fitted and working as designed14
TATrain-crew/loco/stock/unit diagram issues10
OHARS / TMS / SARS software problem (excluding scheduling issues and technical failures)9
JXMiscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains)8
TGDriver8
Since 2018
CodeWhat Network Rail loggedMinutes
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions1,326
TGDriver437
IBPoints failure (including no fault found)399
TOTime lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility)270
Q3NZ Pumps T252
MPRail / wheel interface, adhesion problems (including ice on the running rail)244
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure228
ICTrack circuit failure (including no fault found)227
OHARS / TMS / SARS software problem (excluding scheduling issues and technical failures)217
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail213