Woldingham
0 delay minutes
No delay was picked up at Woldingham in the four weeks to 9 December 2023.
100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | Trains cancelled |
|---|---|---|---|---|
| Network Rail's causes | ||||
| Track | - | - | 8% | - |
| Signals, points and power | - | - | 16% | - |
| Weather and structures | - | - | 7% | - |
| Autumn | - | - | 7% | - |
| External | - | - | 4% | - |
| Network management | - | - | 17% | - |
| The operators' causes | ||||
| Train faults | - | - | 16% | - |
| Traincrew | - | - | 11% | - |
| Stations | - | - | 3% | - |
| Operations | - | - | 5% | - |
| Operator, other | - | - | 7% | - |
Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| Nothing logged. | ||
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 16 |
| OK | Delay caused by Operating staff oversight, issues or absence (excluding signallers and Control) | 12 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 12 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 7 |
| MV | Engineers on-track equipment failure outside possession | 5 |
| OB | Delayed by signaller not applying applicable regulating policy | 4 |
| OF | Delay due to incorrect ETCS system or equipment operation by Signaller / Controller | 4 |
| OU | Delays not Investigated by Network Rail | 3 |
| IK | Telecom equipment failure (including no fault found) | 3 |
| RB | Passengers joining/alighting | 3 |