223 delay minutes

The biggest share (35%) of the delay picked up at Worthing in the four weeks to 9 December 2023 came from how the network was run.

72% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track42%8% 0 a day, more than 2 of the other 4 years-
Signals, points and power3114%16% 1 a day, more than 1 of the other 4 years-
Weather and structures94%7% 0 a day, more than 3 of the other 4 years-
Autumn73%7% 0 a day, more than 3 of the other 4 years-
External115%4% 0 a day, more than 3 of the other 4 years2
Network management7835%17% 3 a day, more than 2 of the other 4 years1
The operators' causes
Train faults63%16% 0 a day, the least in 5 years-
Traincrew178%11% 1 a day, the least in 5 years-
Stations94%3% 0 a day, more than 2 of the other 4 years-
Operations2712%5% 1 a day, the most in 5 years-
Operator, other2511%7% 1 a day, more than 3 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)36
TATrain-crew/loco/stock/unit diagram issues21
J5Infrastructure Asset fault reported but proven to be mistaken20
IISignalling lineside cable fault18
TGDriver15
VHPassenger Communication cord, door egress or emergency train alarm operated15
OCSignaller including mis-routing (not ERTM /ETCS related)11
I1Overhead line/third rail defect10
VETicket irregularities or refusals to pay8
XNRoad or crossing related incidents inc. cars on line, crossing misuse and priority to emergency services (NOT bridge strikes)8
Since 2018
CodeWhat Network Rail loggedMinutes
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)2,026
TGDriver1,611
ICTrack circuit failure (including no fault found)908
VHPassenger Communication cord, door egress or emergency train alarm operated855
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure827
OCSignaller including mis-routing (not ERTM /ETCS related)731
M8Technical failures above the Solebar554
JXMiscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains)485
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.437
MDTechnical failures below the solebar404