Worthing
223 delay minutes
The biggest share (35%) of the delay picked up at Worthing in the four weeks to 9 December 2023 came from how the network was run.
72% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 4 | 2% | 8% | 0 a day, more than 2 of the other 4 years | - |
| Signals, points and power | 31 | 14% | 16% | 1 a day, more than 1 of the other 4 years | - |
| Weather and structures | 9 | 4% | 7% | 0 a day, more than 3 of the other 4 years | - |
| Autumn | 7 | 3% | 7% | 0 a day, more than 3 of the other 4 years | - |
| External | 11 | 5% | 4% | 0 a day, more than 3 of the other 4 years | 2 |
| Network management | 78 | 35% | 17% | 3 a day, more than 2 of the other 4 years | 1 |
| The operators' causes | |||||
| Train faults | 6 | 3% | 16% | 0 a day, the least in 5 years | - |
| Traincrew | 17 | 8% | 11% | 1 a day, the least in 5 years | - |
| Stations | 9 | 4% | 3% | 0 a day, more than 2 of the other 4 years | - |
| Operations | 27 | 12% | 5% | 1 a day, the most in 5 years | - |
| Operator, other | 25 | 11% | 7% | 1 a day, more than 3 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 36 |
| TA | Train-crew/loco/stock/unit diagram issues | 21 |
| J5 | Infrastructure Asset fault reported but proven to be mistaken | 20 |
| II | Signalling lineside cable fault | 18 |
| TG | Driver | 15 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 15 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 11 |
| I1 | Overhead line/third rail defect | 10 |
| VE | Ticket irregularities or refusals to pay | 8 |
| XN | Road or crossing related incidents inc. cars on line, crossing misuse and priority to emergency services (NOT bridge strikes) | 8 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 2,026 |
| TG | Driver | 1,611 |
| IC | Track circuit failure (including no fault found) | 908 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 855 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 827 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 731 |
| M8 | Technical failures above the Solebar | 554 |
| JX | Miscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains) | 485 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 437 |
| MD | Technical failures below the solebar | 404 |