Wrexham General
2,681 delay minutes
The biggest share (19%) of the delay picked up at Wrexham General in the four weeks to 9 December 2023 came from autumn leaves.
44% of these minutes were knock-on from something that happened elsewhere first. 92% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | - | - | 8% | 0 a day, the least in 5 years | - |
| Signals, points and power | 485 | 18% | 16% | 17 a day, more than 2 of the other 4 years | 5 |
| Weather and structures | 53 | 2% | 7% | 2 a day, more than 2 of the other 4 years | 2 |
| Autumn | 502 | 19% | 7% | 18 a day, the most in 5 years | 2 |
| External | 302 | 11% | 4% | 11 a day, the most in 5 years | 2 |
| Network management | 187 | 7% | 17% | 7 a day, more than 2 of the other 4 years | 46 |
| The operators' causes | |||||
| Train faults | 264 | 10% | 16% | 9 a day, the most in 5 years | 16 |
| Traincrew | 261 | 10% | 11% | 9 a day, the most in 5 years | 14 |
| Stations | 62 | 2% | 3% | 2 a day, more than 2 of the other 4 years | - |
| Operations | 145 | 5% | 5% | 5 a day, more than 3 of the other 4 years | 2 |
| Operator, other | 421 | 16% | 7% | 15 a day, the most in 5 years | 18 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TT | Leaf fall Neutral | 407 |
| IJ | AWS/ATP/TPWS/Train stop/On track equipment failure | 388 |
| Q3 | NZ Pumps T | 351 |
| XK | National Grid Power Failure - local area also affected (inc outage, surges, blips where working standby generator/UPS installed) | 223 |
| TG | Driver | 152 |
| TZ | Other Passenger Train Operating Company causes | 122 |
| QI | Cautioning due to railhead leaf contamination | 120 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 87 |
| XP | BRIDGE HIT | 68 |
| M8 | Technical failures above the Solebar | 63 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| T2 | Delay at unstaffed station to non-DOO train | 3,907 |
| TG | Driver | 3,217 |
| MD | Technical failures below the solebar | 2,498 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 2,478 |
| TH | (Senior) Conductor/Train Manager | 2,206 |
| M8 | Technical failures above the Solebar | 2,154 |
| TZ | Other Passenger Train Operating Company causes | 2,140 |
| IC | Track circuit failure (including no fault found) | 2,012 |
| ID | Level crossing faults and failure incl. barrow/foot crossings and crossing treadles | 1,726 |
| OU | Delays not Investigated by Network Rail | 1,690 |