Wishaw
29 delay minutes
Most of the delay picked up at Wishaw in the four weeks to 9 December 2023 came from how the network was run.
0% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | Trains cancelled |
|---|---|---|---|---|
| Network Rail's causes | ||||
| Track | - | - | 8% | - |
| Signals, points and power | - | - | 16% | - |
| Weather and structures | - | - | 7% | - |
| Autumn | - | - | 7% | - |
| External | - | - | 4% | - |
| Network management | 29 | 100% | 17% | 1 |
| The operators' causes | ||||
| Train faults | - | - | 16% | 1 |
| Traincrew | - | - | 11% | 1 |
| Stations | - | - | 3% | - |
| Operations | - | - | 5% | - |
| Operator, other | - | - | 7% | - |
Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| J8 | OTM DAMAGE | 29 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| J8 | OTM DAMAGE | 34 |
| MB | Electic Loco failure, defect, attention | 16 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 14 |
| XP | BRIDGE HIT | 11 |
| FO | Time Lost en-route believed to be operator cause and information required from Operator (Ops Responsibility) | 10 |
| MU | Depot operating problem | 10 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 10 |
| M7 | Door and Door system faults | 9 |
| RV | Customer Information system failure | 7 |
| QM | Train schedule/STP Process including erroneous simplifiers | 7 |