Leaves on the Line

Whitland

WTL Wales route
CSV JSON

909 delay minutes

The biggest share (39%) of the delay picked up at Whitland in the four weeks to 9 December 2023 came from signal, points and power faults.

43% of these minutes were knock-on from something that happened elsewhere first. 81% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track404%8% 1 a day, more than 3 of the other 4 years-
Signals, points and power35139%16% 13 a day, the most in 5 years1
Weather and structures758%7% 3 a day, more than 3 of the other 4 years2
Autumn768%7% 3 a day, the most in 5 years-
External4<1%4% 0 a day, more than 1 of the other 4 years-
Network management566%17% 2 a day, more than 1 of the other 4 years-
The operators' causes
Train faults17719%16% 6 a day, the most in 5 years1
Traincrew435%11% 2 a day, more than 1 of the other 4 years1
Stations526%3% 2 a day, more than 3 of the other 4 years-
Operations344%5% 1 a day, more than 1 of the other 4 years-
Operator, other2<1%7% 0 a day, more than 1 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
ICTrack circuit failure (including no fault found)144
IBPoints failure (including no fault found)109
X2Severe flooding beyond that which could be mitigated on Network Rail infrastructure75
M8Technical failures above the Solebar53
T2Delay at unstaffed station to non-DOO train52
MSPlanned underpowered or shortformed service and or vehicle, incl. exam set swaps51
QHAdhesion problems due to leaf contamination45
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.40
JPFailure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards39
MUDepot operating problem39
Since 2018
CodeWhat Network Rail loggedMinutes
ICTrack circuit failure (including no fault found)2,854
T2Delay at unstaffed station to non-DOO train2,413
JSCondition of Track TSR outside the Timetable Planning Rules1,650
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.1,471
MDTechnical failures below the solebar1,411
TGDriver1,386
M8Technical failures above the Solebar1,331
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail1,177
IBPoints failure (including no fault found)1,173
TH(Senior) Conductor/Train Manager1,163