West Worthing
537 delay minutes
The biggest share (25%) of the delay picked up at West Worthing in the four weeks to 9 December 2023 came from how the network was run.
55% of these minutes were knock-on from something that happened elsewhere first. 99% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 40 | 7% | 8% | 1 a day, more than 1 of the other 4 years | - |
| Signals, points and power | 92 | 17% | 16% | 3 a day, more than 3 of the other 4 years | - |
| Weather and structures | 7 | 1% | 7% | 0 a day, more than 1 of the other 4 years | - |
| Autumn | 9 | 2% | 7% | 0 a day, more than 2 of the other 4 years | - |
| External | 122 | 23% | 4% | 4 a day, the most in 5 years | 2 |
| Network management | 135 | 25% | 17% | 5 a day, the least in 5 years | - |
| The operators' causes | |||||
| Train faults | 21 | 4% | 16% | 1 a day, more than 1 of the other 4 years | 2 |
| Traincrew | 55 | 10% | 11% | 2 a day, more than 1 of the other 4 years | - |
| Stations | 27 | 5% | 3% | 1 a day, the most in 5 years | - |
| Operations | 3 | <1% | 5% | 0 a day, more than 1 of the other 4 years | - |
| Operator, other | 27 | 5% | 7% | 1 a day, more than 1 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| XN | Road or crossing related incidents inc. cars on line, crossing misuse and priority to emergency services (NOT bridge strikes) | 112 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 65 |
| TG | Driver | 55 |
| QM | Train schedule/STP Process including erroneous simplifiers | 34 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 28 |
| II | Signalling lineside cable fault | 21 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 17 |
| IC | Track circuit failure (including no fault found) | 16 |
| I1 | Overhead line/third rail defect | 13 |
| IA | Signal failure (including no fault found) | 13 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 3,816 |
| TG | Driver | 2,981 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 1,698 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 1,500 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 1,213 |
| II | Signalling lineside cable fault | 1,141 |
| IC | Track circuit failure (including no fault found) | 1,104 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 1,004 |
| M8 | Technical failures above the Solebar | 762 |
| IB | Points failure (including no fault found) | 645 |