537 delay minutes

The biggest share (25%) of the delay picked up at West Worthing in the four weeks to 9 December 2023 came from how the network was run.

55% of these minutes were knock-on from something that happened elsewhere first. 99% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track407%8% 1 a day, more than 1 of the other 4 years-
Signals, points and power9217%16% 3 a day, more than 3 of the other 4 years-
Weather and structures71%7% 0 a day, more than 1 of the other 4 years-
Autumn92%7% 0 a day, more than 2 of the other 4 years-
External12223%4% 4 a day, the most in 5 years2
Network management13525%17% 5 a day, the least in 5 years-
The operators' causes
Train faults214%16% 1 a day, more than 1 of the other 4 years2
Traincrew5510%11% 2 a day, more than 1 of the other 4 years-
Stations275%3% 1 a day, the most in 5 years-
Operations3<1%5% 0 a day, more than 1 of the other 4 years-
Operator, other275%7% 1 a day, more than 1 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
XNRoad or crossing related incidents inc. cars on line, crossing misuse and priority to emergency services (NOT bridge strikes)112
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)65
TGDriver55
QMTrain schedule/STP Process including erroneous simplifiers34
IRBroken/cracked/twisted/buckled/flawed rail28
IISignalling lineside cable fault21
VHPassenger Communication cord, door egress or emergency train alarm operated17
ICTrack circuit failure (including no fault found)16
I1Overhead line/third rail defect13
IASignal failure (including no fault found)13
Since 2018
CodeWhat Network Rail loggedMinutes
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)3,816
TGDriver2,981
OCSignaller including mis-routing (not ERTM /ETCS related)1,698
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure1,500
VHPassenger Communication cord, door egress or emergency train alarm operated1,213
IISignalling lineside cable fault1,141
ICTrack circuit failure (including no fault found)1,104
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.1,004
M8Technical failures above the Solebar762
IBPoints failure (including no fault found)645