Wrexham Central
1,959 delay minutes
The biggest share (34%) of the delay picked up at Wrexham Central in the four weeks to 9 December 2023 came from other operator causes.
96% of these minutes were knock-on from something that happened elsewhere first. 87% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | - | - | 8% | 0 a day, the least in 5 years | - |
| Signals, points and power | 26 | 1% | 16% | 1 a day, more than 2 of the other 4 years | 1 |
| Weather and structures | 42 | 2% | 7% | 2 a day, more than 3 of the other 4 years | 1 |
| Autumn | 632 | 32% | 7% | 23 a day, the most in 5 years | 3 |
| External | 44 | 2% | 4% | 2 a day, more than 3 of the other 4 years | 1 |
| Network management | 60 | 3% | 17% | 2 a day, more than 2 of the other 4 years | 9 |
| The operators' causes | |||||
| Train faults | 124 | 6% | 16% | 4 a day, the most in 5 years | 8 |
| Traincrew | 116 | 6% | 11% | 4 a day, more than 2 of the other 4 years | 1 |
| Stations | 163 | 8% | 3% | 6 a day, more than 2 of the other 4 years | - |
| Operations | 94 | 5% | 5% | 3 a day, more than 3 of the other 4 years | - |
| Operator, other | 659 | 34% | 7% | 24 a day, the most in 5 years | 1 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TT | Leaf fall Neutral | 659 |
| Q3 | NZ Pumps T | 565 |
| T2 | Delay at unstaffed station to non-DOO train | 163 |
| TZ | Other Passenger Train Operating Company causes | 91 |
| M0 | Confirmed train cab based safety system fault (including GSMR) | 77 |
| FC | Freight Train Driver error, SPAD, Wrong routing or Missed AWS/DSD [No change] | 71 |
| QI | Cautioning due to railhead leaf contamination | 67 |
| XP | BRIDGE HIT | 44 |
| X2 | Severe flooding beyond that which could be mitigated on Network Rail infrastructure | 42 |
| MD | Technical failures below the solebar | 39 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| T2 | Delay at unstaffed station to non-DOO train | 7,000 |
| TH | (Senior) Conductor/Train Manager | 3,257 |
| TG | Driver | 2,554 |
| MD | Technical failures below the solebar | 1,859 |
| TT | Leaf fall Neutral | 1,853 |
| Q3 | NZ Pumps T | 1,663 |
| TZ | Other Passenger Train Operating Company causes | 1,315 |
| OU | Delays not Investigated by Network Rail | 1,284 |
| ZY | Univestigated station overtime System Roll-up Only | 1,124 |
| M8 | Technical failures above the Solebar | 997 |