Yoker
8 delay minutes
Most of the delay picked up at Yoker in the four weeks to 9 December 2023 came from how the network was run.
63% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | Trains cancelled |
|---|---|---|---|---|
| Network Rail's causes | ||||
| Track | - | - | 8% | - |
| Signals, points and power | - | - | 16% | - |
| Weather and structures | - | - | 7% | - |
| Autumn | - | - | 7% | - |
| External | - | - | 4% | - |
| Network management | 8 | 100% | 17% | - |
| The operators' causes | ||||
| Train faults | - | - | 16% | - |
| Traincrew | - | - | 11% | - |
| Stations | - | - | 3% | - |
| Operations | - | - | 5% | 1 |
| Operator, other | - | - | 7% | - |
Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| OH | ARS / TMS / SARS software problem (excluding scheduling issues and technical failures) | 8 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 76 |
| M8 | Technical failures above the Solebar | 55 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 53 |
| X2 | Severe flooding beyond that which could be mitigated on Network Rail infrastructure | 33 |
| IB | Points failure (including no fault found) | 26 |
| XT | Severe snow or ice affecting infrastructure which is the responsibility of NR (including implementation of Key Route Strategy) | 26 |
| TG | Driver | 23 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 16 |
| TZ | Other Passenger Train Operating Company causes | 16 |
| QI | Cautioning due to railhead leaf contamination | 15 |